|
From theory to practice.
We accompany each single step.
When your project starts a qualified project manager is designated your permanent contact person throughout the whole project. He works out the adequate concept for your material flow, selects the suitable plant components and comprehensively accompanies the production process.
He coordinates and controls all work throughout the entire project duration, all the way to system start-up and employee training.
|
MAXIM Markenprodukte GmbH & Co. KGTask The company MAXIM expanded its production area in Pulheim by a new department of goods receipt and goods issue. It had to be connected to the wareho... read more |
Dr. August Wolff GmbH & Co. KGTask Due to constant growth, the space in the goods receipt and goods issue had become insufficient.at the company site Dr. August Wolff. A new building for ... read more |
Roth+Rau AG - Hyundai Heavy Industries CTask The company Roth & Rau AG, general contractor and supplier for complete cell lines has provided the company HHI with a complete system including an overhead b... read more |
Nikon GmbHTask Due to the increasing turnover, order picking- and shipping area at the existing location had to be redesigned. In addition, repaired goods ought to be packed and... read more |
Wigo-Werk Kreuznach Chemische Fabrik GmbTask The company Wigo-Werk built a new storage for dangerous goods on its existing site. Due to the high pallet turnover per day the storage ought to be c... read more |
Bürstner GmbHMulty-Storey Magazine Equipment + Storage for EURO-Pallets Task In a previous planning contract Förster & Krause determined the performance details for a new Spare Parts Storage - Europe and th... read more |
BBS Kraftfahrzeugtechnik AGNarrow Aisle-Storage for Euro-Pallets – Two Deep Storage Task BBS is a well-known producer of high-quality alloy rims for cars. Since an amplification of the headquarter in ... read more |
Hella Fahrzeugkomponenten GmbHTask Due to the varying requirements in the automotive industry, the company Hella has to provide different types of packaging and shipping for different customers. Therefore an ... read more |
Steinhaus GmbHTask Due to the strong sales increase on the convenience sector, for the company Steinhaus it became necessary to redesign and optimize the packing- as well as the r... read more |
ABB AGTask ABB as a producer of transformers decided to have the in-company logistics/material flows checked through an external planning office. The aim is to sort out ... read more |
TFT Thüringer Fiber-Trommeln GmbHTask The TFT GmbH is widening its production. The extension of the required conveyor technology was realised in two independent steps. 1. The company TFT has put in ope... read more |
Geha German Hardcopy AGTask The company Geha had to move to new premises due to its growth in sales. There order picking ought to be performed in an optimized a... read more |
Hella Innenleuchten-Systeme GmbHTask The company Hella Innenleuchten-Systeme GmbH (Interior Light Systems) had built a new assembly centre for the automatic assembly of interior lights. Material should be supplied to a... read more |
Nikon GmbHTask Due to the increasing turnover, order picking- and shipping area at the existing location had to be redesigned. In addition, repaired goods ought to be packed and... read more |
Conditess Feine Kuchen GmbHTask Conditess Feine Kuchen GmbH has doubled its production capacity. As a consequence of this enhancement it became necessary to review the whole logistics of finished products. ... read more |
- + 2 |
Förster & Krause GmbH
Parkstrasse 34
D- 42853 Remscheid
Fon: +49-2191-49208-0
Fax: +49-2191-49208-66
Email:f-k@foerster-krause.de