|
„What does not fit will be made to fit.“
But not with us.
According to the instructions of the project manager, assemblies of the systems components, drive- and control units are performed by our service technicians on your company site. Due to their long lasting experience with our systems components, they work with the utmost care, preciseness and speed.
Our technicians are also skilled in connecting already existing conveyor technologies. Coordinated and precise assembly of new elements can be taken for granted.
|
Steinhaus GmbHTask Empty bins coming up at the packing places ought to be returned to the production department, respectively be buffered in an intermediate storage if necessary. The... read more |
W. Armbruster Teigwaren GmbHTask The company W. Armbruster Teigwaren GmbH has extended its production by two production machines. At the end of the production lines the finished goods (noodles pack... read more |
Wigo-Werk Kreuznach Chemische Fabrik GmbTask The company Wigo-Werk built a new storage for dangerous goods on its existing site. Due to the high pallet turnover per day the storage ought to be c... read more |
ebm-papst St. Georgen GmbH & Co. KGAufgabe Die Firma ebm-papst St. Georgen hat eine neue Montagelinie für die Fertigung von Ventilatoren installiert. Über eine neue Förderstrecke wurde ein Bypass installiert, um einzelne Montag... read more |
Plastal GmbHTask The company Plastal GmbH restored an existing two-storey building on the own premises. On the first floor an assembly line was installed. Supply and removal of th... read more |
W. Armbruster Teigwaren GmbHTask The company W. Armbruster Teigwaren GmbH has extended its production by two production machines. At the end of the production lines the finished goods (noodles packed in ... read more |
BBS Kraftfahrzeugtechnik AGNarrow Aisle-Storage for Euro-Pallets – Two Deep Storage Task BBS is a well-known producer of high-quality alloy rims for cars. Since an amplification of the headquarter i... read more |
WEMAG A. Ruland GmbH & Co. KGTask WEMAG amplified its warehouse on the existing site. Due to lack of space, the extension had to be realized on several levels. In order to design the... read more |
WEMAG A. Ruland GmbH & Co. KGTask WEMAG amplified its warehouse on the existing site. Due to lack of space, the extension had to be realized on several levels. In order to design the... read more |
WEMAG A. Ruland GmbH & Co. KGTask WEMAG amplified its warehouse on the existing site. Due to lack of space, the extension had to be realized on several levels. In order to design the... read more |
MAXIM Markenprodukte GmbH & Co. KGTask The company MAXIM expanded its production area in Pulheim by a new department of goods receipt and goods issue. It had to be connected to the wareho... read more |
Nikon GmbHTask Due to the increasing turnover, order picking- and shipping area at the existing location had to be redesigned. In addition, repaired goods ought to be packed and... read more |
Steinhaus GmbHTask Due to the strong sales increase on the convenience sector, for the company Steinhaus it became necessary to redesign and optimize the packing- as well as the r... read more |
Medice Arzneimittel Pütter GmbH & Co. KGTask The company Medice extended its range of products through purchase. As a consequence the whole order picking system had to be redesigned and order picking ought... read more |
Rudolf Dankwardt GmbHTask The production site in Jessenitz has been enlarged. The new production hall includes two levels which shall be connected via pallet conveyor technology in order to auto... read more |
- + 2 |
Förster & Krause GmbH
Parkstrasse 34
D- 42853 Remscheid
Fon: +49-2191-49208-0
Fax: +49-2191-49208-66
Email:f-k@foerster-krause.de