Products & Solutions > References > Automotive industry > Plastal GmbH
Plastal GmbH
Task
The company Plastal GmbH restored an existing two-storey building on the own premises. On the first floor an assembly line was installed. Supply and removal of the material ought to be realized via automatic pallet conveyor system. Since many different pallet types are used in the automotive industry, a carrier pallet had to be designed.

Solution
The carrier pallet remains in the closed conveyor system.
In the ground floor the empty pallets are conveyed to the loading station where the carrier pallets are loaded. The material to be loaded is provided on different types of pallets. Multy-layer loading of carrier pallets is possible. Subsequent to loading, the pallet is delivered to the vertical conveyor and forwarded from the ground floor to the first floor. Then the carrier pallet is lead to the offtake station and the pallets are removed via lift truck. The empty carrier pallet is directed via conveyor line to the vertical conveyor which returns it to the loading station in the ground floor.

The whole conveyor system is designed for twelve carrier pallets running in a closed circuit. There are always six full and six empty pallets spread over the system. In the first floor the conveyor section is equipped with two high-speed doors which open to let the pallets pass through and automatically close again. Thus access to the vertical conveyor is inhibited.

Material to be conveyed
Carrier pallet 2.750 x 1.850 x 350 mm (LxWxH),
max. loading height 2.100 mm, max. weight 1.000 kg
Conveying capacity
approx. 30 pallets / h
Incorporated components
Roller conveyors, lifting tables with roller conveyor, chain conveyors, vertical conveyors with roller conveyors, protective guarding, 2 high-speed doors
Control unit
Siemens S7-300

plastal_01

plastal_02b

plastal_03
 
References

TFT Thüringer Fiber-Trommeln GmbH

News image

Task The TFT GmbH is widening its production. The extension of the required conveyor technology was realised in two independent steps. 1. The company TFT has put in ope...

read more

Rudolf Dankwardt GmbH

News image

Task The production site in Jessenitz has been enlarged. The new production hall includes two levels which shall be connected via pallet conveyor technology in order to auto...

read more

Geha German Hardcopy AG

News image

Task The company Geha had to move to new premises due to its growth in sales. There order picking ought to be performed in an optimized a...

read more

Nikon GmbH

News image

Task Due to the increasing turnover, order picking- and shipping area at the existing location had to be redesigned. In addition, repaired goods ought to be packed and...

read more

Nikon GmbH

News image

Task Due to the increasing turnover, order picking- and shipping area at the existing location had to be redesigned. In addition, repaired goods ought to be packed and...

read more

Hella Fahrzeugkomponenten GmbH

News image

Task Due to the varying requirements in the automotive industry, the company Hella has to provide different types of packaging and shipping for different customers. Therefore an ...

read more

Roth+Rau AG - Hyundai Heavy Industries C

News image

Task The company Roth & Rau AG, general contractor and supplier for complete cell lines has provided the company HHI with a complete system including an overhead b...

read more

PPS P.E.T. Packaging Solution AG

News image

Task The company PPS, manufacturer of plastic tanks for the food- and pharmaceutical industry, built a new production plant in Switzerland. In order to avoid lift trucks w...

read more

Roth+Rau AG - Millinet Solar Co. Ltd.

News image

Task With the company Roth & Rau AG, general contractor and supplier for complete cell lines, an order was placed by the company Millinet for delivery of a compl...

read more

Medice Arzneimittel Pütter GmbH & Co. KG

News image

Task The company Medice extended its range of products through purchase. As a consequence the whole order picking system had to be redesigned and order picking ought...

read more

Conergy SolarModule GmbH & Co. KG

News image

Task Conergy has put into operation its first production plant in Frankfurt (Oder) where production is performed from the wafer over the cell to the finished solar modu...

read more

Dr. August Wolff GmbH & Co. KG

News image

Task Due to constant growth, the space in the goods receipt and goods issue had become insufficient.at the company site Dr. August Wolff. A new building for ...

read more

Delica AG

News image

Aufgabe Die Firma Delica AG (ehemals Migros) hat ihre Produktion erweitert und will die Entsorgung der Produktionsmaschinen und die anschließende Palettierung der Fertigwaren (Trockenlebensmittel in Schlauchbeute...

read more

MAXIM Markenprodukte GmbH & Co. KG

News image

Task The company MAXIM expanded its production area in Pulheim by a new department of goods receipt and goods issue. It had to be connected to the wareho...

read more

ABB AG

Task ABB as a producer of transformers decided to have the in-company logistics/material flows checked through an external planning office. The aim is to sort out ...

read more
-
+
2
Kontakt

Förster & Krause GmbH
Parkstrasse 34
D- 42853 Remscheid

Fon: +49-2191-49208-0
Fax: +49-2191-49208-66

Email:f-k@foerster-krause.de