Beewen GmbH & Co. KGAufgabe Die Firma Beewen GmbH & Co. KG hat von der Firma PSC Converter Solutions GmbH den Auftrag zur Lieferung eines automatischen Kleinteillagers mit der entsprechende... read more |
Conergy SolarModule GmbH & Co. KGTask Conergy has put into operation its first production plant in Frankfurt (Oder) where production is performed from the wafer over the cell to the finished solar modu... read more |
PPS P.E.T. Packaging Solution AGTask The company PPS, manufacturer of plastic tanks for the food- and pharmaceutical industry, built a new production plant in Switzerland. In order to avoid lift trucks w... read more |
Beewen GmbH & Co. KGAufgabe Die Firma Beewen GmbH & Co. KG hat von der Firma PSC Converter Solutions GmbH den Auftrag zur Lieferung eines automatischen Kleinteillagers mit der entsprechende... read more |
Nikon GmbHTask Due to the increasing turnover, order picking- and shipping area at the existing location had to be redesigned. In addition, repaired goods ought to be packed and... read more |
Conditess Feine Kuchen GmbHTask Conditess Feine Kuchen GmbH has doubled its production capacity. As a consequence of this enhancement it became necessary to review the whole logistics of finished products. ... read more |
Grabower Süsswaren GmbHTask The company Grabower built a new warehouse for finished goods which should be connected with the production area via automatic conveyor system. An automatic wrappi... read more |
Roth+Rau AG - Millinet Solar Co. Ltd.Task With the company Roth & Rau AG, general contractor and supplier for complete cell lines, an order was placed by the company Millinet for delivery of a compl... read more |
Medice Arzneimittel Pütter GmbH & Co. KGTask The company Medice extended its range of products through purchase. As a consequence the whole order picking system had to be redesigned and order picking ought... read more |
Hella Innenleuchten-Systeme GmbHTask The company Hella Innenleuchten-Systeme GmbH (Interior Light Systems) had built a new assembly centre for the automatic assembly of interior lights. Material should be supplied to a... read more |
Steinhaus GmbHTask Due to the strong sales increase on the convenience sector, for the company Steinhaus it became necessary to redesign and optimize the packing- as well as the r... read more |
Geha German Hardcopy AGTask The company Geha had to move to new premises due to its growth in sales. There order picking ought to be performed in an optimized a... read more |
Nikon GmbHTask Due to the increasing turnover, order picking- and shipping area at the existing location had to be redesigned. In addition, repaired goods ought to be packed and... read more |
Betz Logistik & Lagerhaus GmbHNarrow Aisle Storage for Euro-Pallets Task A customer of the automotive supplier sector placed an order for warehousing and order picking of a product range with Betz Logi... read more |
Plastal GmbHTask The company Plastal GmbH restored an existing two-storey building on the own premises. On the first floor an assembly line was installed. Supply and removal of th... read more |
- + 2 |
Förster & Krause GmbH
Parkstrasse 34
D- 42853 Remscheid
Fon: +49-2191-49208-0
Fax: +49-2191-49208-66
Email:f-k@foerster-krause.de