Products & Solutions > References > Commissioning > WEMAG A. Ruland GmbH & Co. KG
WEMAG A. Ruland GmbH & Co. KG
Task
WEMAG amplified its warehouse on the existing site. Due to lack of space, the extension had to be realized on several levels. In order to design the order picking in an optimal way, a conveyor system was employed connecting the order picking areas and conveying the commissioned goods to the packing zone.

Solution
Empty bins are available for order picking on every level. The operator
is provided with a pick note according to which order picking into the bins is performed manually on the corresponding level. When he has completed order picking in his sector he places the bin on the conveyor system and sets the next destination on the coding strip. Via conveyor system the bins are lead to the corresponding areas. When the order is completed the bins are automatically conveyed to the packing zone via conveyor section. The bins are delivered at the packing places, the articles are removed from the bins and packed for shipping.

Material to be conveyed
Plastic bins 600x400x380mm, max. weight 50 kg
Conveying capacity
100 bins / h
Incorporated components
Roller conveyors, vertical conveyors with roller conveyors, belt conveyors, transfer units, stopper, packing places
Control unit
Siemens S7-300, Manual coding device and read stations

wemag_01

wemag_02b

wemag_03
 
References

PPS P.E.T. Packaging Solution AG

News image

Task The company PPS, manufacturer of plastic tanks for the food- and pharmaceutical industry, built a new production plant in Switzerland. In order to avoid lift trucks w...

read more

WEMAG A. Ruland GmbH & Co. KG

News image

Task WEMAG amplified its warehouse on the existing site. Due to lack of space, the extension had to be realized on several levels. In order to design the...

read more

Medice Arzneimittel Pütter GmbH & Co. KG

News image

Task The company Medice extended its range of products through purchase. As a consequence the whole order picking system had to be redesigned and order picking ought...

read more

Geha German Hardcopy AG

News image

Task The company Geha had to move to new premises due to its growth in sales. There order picking ought to be performed in an optimized a...

read more

Bonfiglioli Deutschland GmbH

News image

Task The company Bonfiglioli Deutschland GmbH has purchased a second-hand real estate in Neuss and established there the company site for Germany in terms of warehousing...

read more

Roth+Rau AG - Millinet Solar Co. Ltd.

News image

Task With the company Roth & Rau AG, general contractor and supplier for complete cell lines, an order was placed by the company Millinet for delivery of a compl...

read more

Hella Innenleuchten-Systeme GmbH

News image

Task The company Hella Innenleuchten-Systeme GmbH (Interior Light Systems) had built a new assembly centre for the automatic assembly of interior lights. Material should be supplied to a...

read more

W. Armbruster Teigwaren GmbH

News image

Task The company W. Armbruster Teigwaren GmbH has extended its production by two production machines. At the end of the production lines the finished goods (noodles pack...

read more

Rudolf Dankwardt GmbH

News image

Task The production site in Jessenitz has been enlarged. The new production hall includes two levels which shall be connected via pallet conveyor technology in order to auto...

read more

Grohe AG

News image

Task The company Grohe AG redesigned its whole electroplating section. The finished chrome-plated armatures should be deposited in bins at the end of the process. Then these bi...

read more

W. Armbruster Teigwaren GmbH

News image

Task The company W. Armbruster Teigwaren GmbH has extended its production by two production machines. At the end of the production lines the finished goods (noodles packed in ...

read more

ABB AG

Task ABB as a producer of transformers decided to have the in-company logistics/material flows checked through an external planning office. The aim is to sort out ...

read more

Geha German Hardcopy AG

News image

Task The company Geha had to move to new premises due to its growth in sales. There order picking ought to be performed in an optimized a...

read more

Bonfiglioli Deutschland GmbH

News image

Task The company Bonfiglioli Deutschland GmbH has purchased a second-hand real estate in Neuss and established there the company site for Germany in terms of warehousing...

read more

Conergy SolarModule GmbH & Co. KG

News image

Task Conergy has put into operation its first production plant in Frankfurt (Oder) where production is performed from the wafer over the cell to the finished solar modu...

read more
-
+
2
Kontakt

Förster & Krause GmbH
Parkstrasse 34
D- 42853 Remscheid

Fon: +49-2191-49208-0
Fax: +49-2191-49208-66

Email:f-k@foerster-krause.de