Task
BBS is a well-known producer of high-quality alloy rims for cars. Since an amplification of the headquarter in Schiltach was not possible due to lack of industrial real estate, a decision for the location Herbolzheim was made. Here a concept had to be worked out to include a maximum warehouse capacity on a minimum space.
Solution
Due to the requested pick capacity per pallet the two deep narrow aisle storage was built. The storage is handled by means of positively driven narrow aisle trucks with telescopic forks. A two deep double-row storage rack has a depth of approx. 5.200 m. The storage level 0 was equipped with a tunnel for order picking, i.e. here just one pallet is stored on each side of the rack and the order picker can immediately process the single alloy rim which is individually packed and placed on the pallet. The supply of these ground floor places for order picking is realized via narrow aisle trucks.
Performance details
6.196 pallet spaces
7 work aisles of approx. 57,5 running metres
Transfer aisles for the narrow aisle trucks on both front ends.
5 aisles/ tunnels for order picking
|
Betz Logistik & Lagerhaus GmbHNarrow Aisle Storage for Euro-Pallets Task A customer of the automotive supplier sector placed an order for warehousing and order picking of a product range with Betz Logi... read more |
Rudolf Dankwardt GmbHTask The production site in Jessenitz has been enlarged. The new production hall includes two levels which shall be connected via pallet conveyor technology in order to auto... read more |
MAXIM Markenprodukte GmbH & Co. KGTask The company MAXIM expanded its production area in Pulheim by a new department of goods receipt and goods issue. It had to be connected to the wareho... read more |
Bonfiglioli Deutschland GmbHTask The company Bonfiglioli Deutschland GmbH has purchased a second-hand real estate in Neuss and established there the company site for Germany in terms of warehousing... read more |
Privatmolkerei Naarmann KGTask The company Privatmolkerei Naarmann KG responded to a request from the retail market to place a bigger assortment on Duesseldorf pallets before delivery. However, the... read more |
ABB AGTask ABB as a producer of transformers decided to have the in-company logistics/material flows checked through an external planning office. The aim is to sort out ... read more |
Nikon GmbHTask Due to the increasing turnover, order picking- and shipping area at the existing location had to be redesigned. In addition, repaired goods ought to be packed and... read more |
ABB AGTask ABB as a producer of transformers decided to have the in-company logistics/material flows checked through an external planning office. The aim is to sort out ... read more |
WEMAG A. Ruland GmbH & Co. KGTask WEMAG amplified its warehouse on the existing site. Due to lack of space, the extension had to be realized on several levels. In order to design the... read more |
Nikon GmbHTask Due to the increasing turnover, order picking- and shipping area at the existing location had to be redesigned. In addition, repaired goods ought to be packed and... read more |
Delica AGAufgabe Die Firma Delica AG (ehemals Migros) hat ihre Produktion erweitert und will die Entsorgung der Produktionsmaschinen und die anschließende Palettierung der Fertigwaren (Trockenlebensmittel in Schlauchbeute... read more |
Roth+Rau AG - Millinet Solar Co. Ltd.Task With the company Roth & Rau AG, general contractor and supplier for complete cell lines, an order was placed by the company Millinet for delivery of a compl... read more |
Steinhaus GmbHTask Due to the strong sales increase on the convenience sector, for the company Steinhaus it became necessary to redesign and optimize the packing- as well as the r... read more |
Plastal GmbHTask The company Plastal GmbH restored an existing two-storey building on the own premises. On the first floor an assembly line was installed. Supply and removal of th... read more |
WEMAG A. Ruland GmbH & Co. KGTask WEMAG amplified its warehouse on the existing site. Due to lack of space, the extension had to be realized on several levels. In order to design the... read more |